jjm-logo
Jal Jeevan Mission
PHED Assam
emblem
GOVERNMENT OF ASSAM
Retrofitting of Bordol PWSS
GHUNGHUNIVITA, Goalpara
Public Health Engineering Department
Goalpara Division Division
Latest Water Supplied
464 KL (28-05-2025)
Cumulative Water Supplied
7784.00 KL

Basic details of the scheme are enlisted here, for further information please contact concerned officer of division / sub division

About This Scheme

Name
Retrofitting of Bordol PWSS
Scheme ID
30222595
Division
Goalpara Division
District
Goalpara
Block

Panchayat

LAKHIPUR

PUKHURIPARA

Village

Habitation

GHUNGHUNIVITA

GHUNGHUNIRBHITA, MAIN GHUNGHUNIRBHITA

Implementing Agency details of the scheme are enlisted here

About Scheme

Approved On
1st SLSSC | (2022-23)
No. of FHTC
160.00
Total Cost
8400000.00
State Share
798000.00
Central Share
7182000.00
Handed Over On
2023-12-12 00:00:00

About Implementing Agency

Name of Agency
SUNIL DAS
Work Order Date
-

Jal Mitra & WUC Users details of the scheme are enlisted here

About Jal Mitra

Name
Bistu Goyary
Phone
9678399788

About Section Officer

Name
Umed Ali Ahmed
Phone
9101632963

Water Quality details of the scheme are enlisted here.

About Water Quality

Date of Testing
N/A
PH
N/A
TDS
N/A
Iron
N/A
Arsenic/Flouride
N/A
Residual Chlorine
N/A
Bacteriological Test
N/A

Component details of the scheme are enlisted here.

About Scheme Components

Component Name
Submersible
Specification
Component Name
Centrifugal
Specification

Please click on button to view map.

Map

You need to login to evaluate a scheme.

Register

Login

Water Quality Test Report

Sample Tested Status

Total Samples Tested: 4

Chemical Testing Date: 7/18/2024 12:44:00 PM

Bacteriological Testing Date: 7/18/2024 12:44:00 PM

Water Quality Status: Safe

Remedial Action Status: --

Chemical Contamination Results

Parameter Unit Acceptable Limit Permissible Limit Value Range Status
Free residual Chlorine mg/l 0.2 1 0.200

Safe :1

> 1 Safe
Total Arsenic (As As) mg/l 0.01 No Relaxation 0.000

Safe :1

> 0.01 Safe
Iron (As Fe) mg/l 1 No Relaxation 0.280

Safe :1

> 1 Safe
Total Hardness (As CaCO3) mg/l 200 600 120.000

Safe :1

> 600 Safe
Fluoride (as F) mg/l 1 1.5 0.120

Safe :1

> 1.5 Safe
Chloride (as Cl) mg/l 250 1000 14.180

Safe :1

> 1000 Safe
Total Alkalinity (as Calcium Carbonate) mg/l 200 600 52.000

Safe :1

> 600 Safe
TDS mg/l 500 2000 240.000

Safe :1

> 2000 Safe
pH NA 6.5-8.5 No Relaxation 6.800

Safe :1

6.5-8.5 Safe
Turbidity NTU 1 5 1.400

Safe :1

> 5 Safe

Bacteriological Contamination Results

Parameter Unit Acceptable Limit Permissible Limit Value Range Status
E. coli CFU/100 ml Shall not be detectable in any 100 ml sample No Relaxation 0.000

Safe :1

Shall not be detectable in any 100 ml sample Safe

Sample Testing Results

Date Contaminated Found Remedial Action Location Status Taken
18-07-2024 Chemical and bacteriological both Not required Source Safe
26-07-2023 Chemical and bacteriological both Not required Source Safe
12-05-2023 Bacteriological Not required Source Safe
28-04-2023 Chemical and bacteriological both Not required Source Safe

Nearest Laboratory

Lab Name: DLL Goalpara

Type: GOVT

Address: o/o The Executive Engineer, PHE Goalpara Div, Goalpara, Near DC office, Pin: 783121

Scheme Network Map

You can follow us on:

How satisfied are you with the scheme?